
our work
Real Systems, Real Savings
Every project listed here was designed from scratch, sized precisely, installed professionally, and performing exactly as promised
UNITED BANK OF AFRICA (UBA)
The bank required a continuous and reliable power supply to support its daily operations, which depend heavily on desktops, laptops, networking equipment, CCTV cameras, and other essential electrical systems. However, the unreliable grid supply meant that the bank had to depend heavily on its diesel generator to maintain operations. The generator consumed approximately 60 litres of diesel per day, resulting in a significant and recurring operational cost. To reduce the high cost of diesel consumption and dependence on the generator, while also minimizing reliance on the unreliable grid supply, a solar power solution was considered. A detailed load audit and energy consumption assessment were carried out using energy meter to determine its actual power requirements. Based on the findings, the solar system was designed to efficiently handle the identified loads, providing a reliable alternative power source while reducing the bank’s overall energy and generator operating costs.
Result
Power Rating
100 kW
Batteries
122.88 kWh
Solar Panels
113 Panels
Project Duration
5 days
ROI Period
4 months
Annual Savings
₦29,631,590

OFI GROUP (OLAM FOOD INGREDIENTS)
The organization relied on an existing solar system alongside an alternative power source to support its daily operations, which included teaching, documentation, and other activities that required a reliable power supply. However, the existing solar system was not sufficient to handle the organization’s total electrical load, resulting in the need to ration power and operate only selected appliances. As the organization expanded its operations and required additional appliances to be powered, there was a need to increase the system capacity. A new solar system was therefore introduced to complement the existing system, with proper load separation between the two systems to enable more appliances and activities to operate efficiently
Result
Power Rating
33 kW
Batteries
75 kWh
Solar Panels
40 Panels
Project Duration
4 days

The Church of Jesus Christ of Latter-day Saints
The church was a newly constructed facility that was still under development and had not yet been connected to the public electricity grid. As the building progressed, there was a need to establish a reliable power source that would support essential activities and electrical appliances within the facility upon completion. To provide a dependable and sustainable source of electricity from the outset, a solar power system was incorporated into the project during the construction stage. This approach allowed the church to have its own renewable power source in place as the facility became operational, reducing reliance on conventional electricity sources and supporting the long-term energy needs of the building.
Result
Power Rating
22 kW
Batteries
90 kWh
Solar Panels
60 Panels
Project Duration
1 day

LASS MOTO HOTEL AND BAR
The hotel was experiencing high electricity costs and an unreliable grid power supply, which affected its ability to provide consistent electricity for its daily operations and guest services. Reliable power was particularly important for maintaining essential services such as lighting and ventilation for guests staying at the facility. To reduce the impact of high electricity costs and provide a more dependable source of power, the hotel sought an alternative energy solution that would ensure essential appliances and services remained operational, thereby improving comfort and convenience for its guests.
Result
Power Rating
11 kW
Batteries
15 kWh
Solar Panels
15
Project Duration
1 day

BH Hotel
The residence was located in an area without access to the public electricity grid, making the facility highly dependent on a fuel-powered generator for its daily operations. The continuous use of the generator, coupled with the high cost of petrol, resulted in significant operating expenses and reduced the overall profitability of the business. To provide a more cost-effective and reliable source of electricity, an alternative power solution was required. A solar power system with adequate capacity was therefore designed to efficiently power the required appliances for the stipulated operating duration, while providing a more convenient and sustainable power supply for the staff and guests.
Result
Power Rating
17.2 kW
Batteries
45 kWh
Solar Panels
40
Project Duration
4 days

ONE LION COMPUTER
The client was faced with the need to upgrade his existing power system due to the expansion of his office space and the introduction of additional appliances, including air conditioners and other electrical equipment. His existing solar system was no longer sufficient to meet the increased power demand. Therefore, an upgraded system was required to provide adequate and reliable power for the additional appliances and support the expanded office operations.
Result
Power Rating
11 kW
Batteries
15 kWh
Solar Panels
15 Panels
Project Duration
2 days









































